1

Energy-Efficient 400 kW Chiller Installation Delivers £50,000 Yearly Cost Reduction on Energy and 200 Tonnes CO₂ Reduction

News Discuss 
Project Summary At a prominent confectionery site in York, Newsome has installed a high-capacity 400 kW chiller, marking the timely realisation of the project. Designed to advance ESG targets, the installation boosts system dependability while minimising overall power consumption and CO₂ levels. https://cyberbookmarking.com/story20643832/high-efficiency-400-kw-chiller-installation-secures-fifty-thousand-pounds-yearly-energy-savings-and-200-tonnes-co%E2%82%82-saving

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story