1

Penmann completes specialist HVAC installation for Nutricia’s production facility in Liverpool in line with FSI Phase 1 and 2

News Discuss 
Penmann recently finalised a significant HVAC upgrade at Nutricia’s Liverpool-based production site, supplying a purpose-built ventilation and climate control system built to comply with strict hygiene and production standards. The scope included the complete lifecycle delivery of high-specification HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. https://www.penmann.co.uk/penmann-completes-precision-hvac-upgrade-for-nutricias-fsi-phases-1-2-in-liverpool/

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story