The main park includes a capability of 200 MW while Sandrini II includes a capability of one hundred MW. The total expense of both equally jobs were not disclosed having said that, throughout construction, above 200 workers have been used. The initiatives are anticipated to see a handful of positions https://vacavillesolarcompanies.blogspot.com/2024/10/what-are-benefits-of-installing-solar.html